Got a call from our tiler yesterday, he asked me to meet him this morning at 6:30 am. Basically he only needs a confirmation from the owner that the tiles are all correct as per the contract and/or variation document. Novac told me the tiles should all be completed within three to four days.
Took some picture while I was on site with him this morning.
![]() |
Walk-in Pantry |
![]() |
Theater Room |
![]() |
Kitchen and Dining |
![]() |
Master Bedroom |
![]() |
Ensuite |
![]() |
Walk-in Wardrobe |
![]() |
Bathroom |
![]() |
Kitchen |
![]() |
Novac in front of our house |