Got a call from our tiler yesterday, he asked me to meet him this morning at 6:30 am. Basically he only needs a confirmation from the owner that the tiles are all correct as per the contract and/or variation document. Novac told me the tiles should all be completed within three to four days.
Took some picture while I was on site with him this morning.
![]() |
| Walk-in Pantry |
![]() |
| Theater Room |
![]() |
| Kitchen and Dining |
![]() |
| Master Bedroom |
![]() |
| Ensuite |
![]() |
| Walk-in Wardrobe |
![]() |
| Bathroom |
![]() |
| Kitchen |
![]() |
| Novac in front of our house |